AI Pilot Decision Gates

Three review points that make “start,” “expand,” and “hand off” different decisions.

This is an illustrative working format. It is not a fixed ADC deliverable, a client result, or evidence that any particular pilot has passed these gates.

Operating question

What would change our mind?

A pilot can look successful because a model performs a task in a controlled setting. Expansion asks a different question: whether the assisted workflow improves an operating result while keeping error, user effort, cost, and accountability within acceptable bounds.

Each gate begins with a named decision owner and a short evidence pack. The team should agree on the choices available at that gate before the work begins: advance, continue to answer a specific open question, redesign, or stop. No gate is an automatic promotion to a larger rollout.

The owner of the workflow, technical and security owners, affected users, and the receiving support team may need different evidence. The gate record makes those perspectives visible without replacing the client’s decision authority.

Three checkpoints

Evidence changes with the decision.

A useful gate has a question, evidence, a person authorized to decide, and a clear alternative to advancing.

01 / Entry

Start a bounded trial?

Show: the present workflow, baseline, authorized data, evaluation cases, human review, and the failure that would pause the pilot.

  • Owner: sponsor and process lead.
  • Options: start, narrow, redesign, or decline.
  • Hold when the purpose, access, or reviewer is unclear.
02 / Expansion

Increase the scope?

Show: the change in the end-to-end result, error and correction effort, appropriate use, exception patterns, latency, and operating cost.

  • Owner: sponsor with risk and operating leads.
  • Options: expand, extend a bounded test, redesign, or stop.
  • Hold when aggregate performance hides a material adverse case.
03 / Transfer

Accept into operation?

Show: receiving owners, support route, monitoring, escalation, change control, user guidance, recovery, and an exit or retirement path.

  • Owner: receiving service and process owners.
  • Options: accept, accept with conditions, defer, or retire.
  • Hold when a project team remains the only practical operator.
Review pack

One page of evidence, plus the source material.

The decision record stays compact, while the work behind it is inspectable. The same measures can be revisited as the pilot changes.

Evidence fieldWhat it makes visibleDecision it supports
Workflow and baselineTrigger, current owner, volume or frequency, time, rework, and the outcome that matters.Is there an operating problem worth solving?
Evaluation casesNormal, ambiguous, and adverse examples; what the system may read and do; how a human judges the result.Is the pilot testing the cases that could change the decision?
Benefit and correctionEnd-to-end improvement alongside error severity, correction time, override reasons, and user feedback.Does the assisted process improve after the full human effort is counted?
Risk and controlAccess issues, high-consequence errors, escalation, fallback, and conditions that trigger a pause.Can the team constrain and respond to failures?
Ownership and costProcess, platform, monitoring, support, funding, change, and retirement responsibilities.Can the next team responsibly accept the work?
Illustrative review record

A gate can end with “not yet.”

Consider the fictional service-request summarization idea in the use-case scorecard. At an entry review, the sponsor can name the workflow and the employee who checks drafts. The team has not yet agreed on a representative test set or the rules for handling sensitive requests.

Decision: do not authorize a live-data pilot yet. The data lead will propose a permitted case set; the process lead will define the review and escalation path; the sponsor will reconvene when both are available. The next review asks whether the trial can be bounded and measured, not whether the model can produce a sample summary.

Recording a hold in this way preserves momentum without treating missing evidence as consent. The same record can later show why the team started, changed course, or stopped.

What the review pack produces

A decision record with conditions.

At each scoped gate, the owner would receive a compact record naming the requested decision, baseline and observed result, adverse cases, correction effort, operating cost, contrary evidence, and unresolved risks. Source measurements and reviewer notes remain linked so the conclusion can be challenged.

Problem addressed: a good demonstration can be mistaken for permission to expand. Practical outcome: the client can authorize a bounded next stage, redesign the workflow, or record a hold with a specific evidence owner and next review point. The receiving team can refuse handoff until support and control responsibilities are accepted.

Decision hygiene

Make the record challengeable.

Each gate should let a decision maker trace the recommendation to the evidence and see what is still uncertain.

  • Name the decision, owner, date of review, and options considered.
  • Separate observed results from assumptions and user impressions.
  • Record the strongest contrary evidence and unresolved questions.
  • Assign the next action, owner, review point, and stop trigger.