← All sectorsSector decision guide / 09

IT Infrastructure

AI-enabled operations and cloud modernization both depend on service boundaries, change control, and reliable telemetry. A tool recommendation is premature until ownership and failure response are clear.

Illustrative data center server aisle
Sector boundary

Where the decision sits.

This lens concerns workload placement, reliability, and production operations, not the business-product adoption covered under Enterprise Technology. ADC will design and validate decisions with the service owner; client teams authorize and execute changes.

A service owner will demand recoverability, identity control, observable dependencies, and a safe action path before using AI in production operations.

Executive agenda

Questions that determine the investment.

Each question has evidence that a sponsor can request before expanding a pilot.

01

Incident response

  • QuestionDoes alert correlation shorten diagnosis or only produce more plausible suggestions?
  • EvidenceIncident timeline, approved runbooks, false actions, and human escalation.
02

Dependency and migration

  • QuestionCan the team name every application, identity, network, and data dependency before moving a workload?
  • EvidenceDependency map, change window, rollback, backup and restore test.
03

Resilience and security

  • QuestionWhat happens when telemetry, cloud access, or the model is unavailable or compromised?
  • EvidenceRecovery objectives, identity scope, logging, restoration evidence, and manual path.
04

Cost and performance

  • QuestionDoes proposed optimization preserve service and recovery targets?
  • EvidenceBaseline spend, performance, utilization, SLOs, and failure-domain exposure.
Where work gets stuck

Three operating situations to test.

01

Alert correlation produces many suggestions but few approved actions.

  • Evidence to examineIncident, change, and service-level history for the target workload.
02

A migration plan omits identity, backup, or support handoffs.

  • Evidence to examineDependencies, access model, backup and restore evidence, and support coverage.
03

A cost optimization conflicts with resilience or performance expectations.

  • Evidence to examineBaseline cost and performance with explicit non-negotiable controls.
Pilot design

Work ADC will lead and the outputs it will deliver.

Scope is agreed before kickoff. Client-designated owners retain operational, safety, clinical, engineering, and regulated decisions.

01

Dependency

  • ADC workDiscover application, identity, network, and data dependencies.
  • Decision-ready outputWorkload dependency map.
02

Recoverability

  • ADC workReview recovery objectives and witness restore evidence.
  • Decision-ready outputRTO/RPO and restore test record.
03

Cutover

  • ADC workRehearse change, rollback, and support handoffs with owners.
  • Decision-ready outputMigration acceptance gate.
04

Economics

  • ADC workCompare run and support cost against service and failure floors.
  • Decision-ready outputTCO and reliability decision table.

Readiness checks

01

Identity

  • ADC workTest privileged access, logging, and offboarding.
  • Design outputAccess and operations control map.
02

Degraded mode

  • ADC workTest telemetry loss, provider outage, and manual recovery.
  • Design outputIncident and fallback runbook.
Priority options

Opportunities to compare.

01

Incident correlation

  • Value hypothesisShorten diagnosis
  • Proof before investmentVerify action against past incident records
02

Migration dependency review

  • Value hypothesisAvoid failed cutovers
  • Proof before investmentTest identity, backup, restore, and rollback
03

Workload optimization

  • Value hypothesisControl spend without service loss
  • Proof before investmentCompare cost with SLO and recovery floors

Measures on the scorecard

01

Service

  • What the decision maker should seeTime to useful diagnosis and restoration, not alert count.
02

Control

  • What the decision maker should seeApproved versus reversed changes and successful restore tests.
03

Economics

  • What the decision maker should seeTotal workload cost measured with reliability and support effort.
Working sequence

From evidence to a decision.

ADC will produce analysis and recommendations. The client retains authority to act.

01

Frame

  • ADC workWe will define one workload decision and service owner.
  • OutputRecovery and service acceptance criteria.
02

Examine

  • ADC workWe will map dependencies, identity, cost, and failure domains.
  • OutputWorkload boundary and TCO baseline.
03

Test

  • ADC workWe will design a client-run restore and rollback rehearsal.
  • OutputRecovery evidence and unresolved risks.
04

Recommend

  • ADC workWe will propose a migration, modernization, or hold decision.
  • OutputCutover gate and operating handoff.
Service application

How ADC services apply.

01

AI Strategy & Roadmap

Prioritize operational decisions where the signal, action, and service outcome can be connected.

03

Cloud Transformation

Compare migration and modernization paths on cost, resilience, security, and team capacity together.

Risks to resolve early

  • A production action is proposed without a tested rollback or restore path.
  • A cloud migration plan omits identity and support handoffs.
  • Cost savings depend on weakening a recovery or performance target.

Focused first engagement: We will trace one recurring alert cluster through incident response and deliver a dependency, approved-action, and rollback decision record.

Independent sector reading

These sources inform sector context. ADC is not affiliated with their publishers. Examples are illustrative and do not describe completed client work.

Bring the real decision.

Describe the workflow, constraint, or investment choice you are weighing. We can discuss an appropriate first step.

Send a message